Estimated Cost: ₹ 23,76,000

Cost Of River Sand G+4 Construction In Bangalore

Estimated Cost ₹ 23,76,000
Architectural Plans ₹ 89,100

Foundation ₹ 10,69,200

Super Structure ₹ 26,73,000

Electrical works (with fittings) ₹ 7,12,800

Plumbing works (with fittings) ₹ 8,01,900

Finishing (Tiling, Painting, Flooring, Countertops, Woodwork) ₹ 26,73,000

Elevation Works ₹ 0

Miscellaneous works ₹ 8,91,000

×

Get Free Quotes

Our experts will call you and provide you with free quotes

Property Type

What is the status of your project?

+91

Price Trend Across Year

Average Cost
₹ 22,43,238

Cost Breakup

Clear pricing.No surprise fees.
Modular Kitchen 47916

Assuming an l-shaped modular kitchen of dimensions 7x4 Ft. with MDF wood construction. Other factors taht will contribute is the countertop material and kind of attachements taht yo uwould want inside it. hte chimney orice is excluded here

Modular Kitchen 47916

Assuming an l-shaped modular kitchen of dimensions 7x4 Ft. with MDF wood construction. Other factors taht will contribute is the countertop material and kind of attachements taht yo uwould want inside it. hte chimney orice is excluded here

Modular Kitchen 47916

Assuming an l-shaped modular kitchen of dimensions 7x4 Ft. with MDF wood construction. Other factors taht will contribute is the countertop material and kind of attachements taht yo uwould want inside it. hte chimney orice is excluded here

Modular Kitchen 47916

Assuming an l-shaped modular kitchen of dimensions 7x4 Ft. with MDF wood construction. Other factors taht will contribute is the countertop material and kind of attachements taht yo uwould want inside it. hte chimney orice is excluded here

Modular Kitchen 47916

Assuming an l-shaped modular kitchen of dimensions 7x4 Ft. with MDF wood construction. Other factors taht will contribute is the countertop material and kind of attachements taht yo uwould want inside it. hte chimney orice is excluded here

Total Price
₹ 1200000

Customize Your Kitchen

Clear pricing.No surprise fees.
Type Of Construction Rental

Size Of Plot 1800

Utilisable Gorund Space 1350

No Of Floors 5

Total Constructible Area 6750

Cement Chettinad Cement

Steel Pulkit Steel

Bricks/Blocks Red Bricks

RCC Design Mix M20

Room Flooring Vitrified Flooring (45 Rs/sqft)

Staircase Flooring Granite Flooring (50 Rs/sft)

Sanitary ware ESS ESS

Main door Frame and Door Honne Wood

Room Door Frames Red Sal Wood

Staircase Railings Mild Steel

Internal Painting Asian Paints Tractor Emulsion

External Painting Berger WeatherCoat Smooth

Electrical Switches and Wires Havells Modular Switches

Miscellaneous works Sump Tank, Overhead Tank, Compound Wall, Main Gate

Specific Elevation Works Texture Painting

Estimate The Cost Of Your River sand G+4 Construction Project Click here to estimate